Search
Now showing items 1-7 of 7
CFD Analysis on the Single-Phase Flow Electrical Submersible Pump Performance Curve
(Public Knowledge Project, 2020-12)
Most of the industrial fields, especially oil and gas, involve the application of electrical submersible pump (ESP) for flow transport. The pump performance will deteriorate depending on conditions of usage. The main ...
Influence of changing casing groove parameters on the performance of centrifugal compressors near stall condition
(American Society of Mechanical Engineers., 2015-09)
The casing treatment is an effective method for increasing the stall margin of compressors and enhancing the flow distribution at the blades tip. The present numerical study focuses on making an optimization of the casing ...
A robust modification to the universal cavitation algorithm in journal bearings
(American Society of Mechanical Engineers., 2017-05)
In the current study, a modified fast converging, mass-conserving, and robust algorithm is proposed for calculation of the pressure distribution of a cavitated axially grooved journal bearing based on the finite volume ...
Modelling and solving the multi-quays berth allocation and crane assignment problem with availability constraints
(Springer, 2020-03)
In this work, we are interested in the multi-quays berth allocation and crane assignment problem under availability restrictions. Availability restrictions may arise due weather conditions, or when, for example, cranes ...
A rolling horizon approach for the integrated multi-quays berth allocation and crane assignment problem for bulk ports
(Growing Science, 2019)
In this paper, an efficient rolling horizon-based heuristic is presented to solve the integrated berth allocation and crane assignment problem in bulk ports. We were guided by a real case study of a multi-terminal port, ...
The integrated multi-quay Berth Allocation and Crane Assignment Problem: Formulation and case study
(IEEE, 2018)
In the literature, some works deal with the integrated Berth Allocation and Crane Assignment Problem (BACAP) in container and bulk port context. Most of them consider that equipment are always available and high tide periods ...
A Variable Neighborhood Descent Heuristic for the Multi-quay Berth Allocation and Crane Assignment Problem Under Availability Constraints
(Springer, 2018-10)
In this paper, we consider the integrated Berth Allocation and Crane Assignment problem, with availability constraints and high tides restrictions, in bulk port context. We were inspired by a real case study of a port owned ...