Search
Now showing items 1-3 of 3
Modelling and solving the multi-quays berth allocation and crane assignment problem with availability constraints
(Springer, 2020-03)
In this work, we are interested in the multi-quays berth allocation and crane assignment problem under availability restrictions. Availability restrictions may arise due weather conditions, or when, for example, cranes ...
The integrated multi-quay Berth Allocation and Crane Assignment Problem: Formulation and case study
(IEEE, 2018)
In the literature, some works deal with the integrated Berth Allocation and Crane Assignment Problem (BACAP) in container and bulk port context. Most of them consider that equipment are always available and high tide periods ...
A Variable Neighborhood Descent Heuristic for the Multi-quay Berth Allocation and Crane Assignment Problem Under Availability Constraints
(Springer, 2018-10)
In this paper, we consider the integrated Berth Allocation and Crane Assignment problem, with availability constraints and high tides restrictions, in bulk port context. We were inspired by a real case study of a port owned ...