Browsing Mechanical Engineering by Author "Krimi, Issam"
Now showing items 1-8 of 8
-
The integrated multi-quay Berth Allocation and Crane Assignment Problem: Formulation and case study
Krimi, Issam; Benmansour, Rachid; Cadi, Abdessamad Ait el; Duvivier, David; Elhachemi, Nizar; ETAL. (IEEE, 2018)In the literature, some works deal with the integrated Berth Allocation and Crane Assignment Problem (BACAP) in container and bulk port context. Most of them consider that equipment are always available and high tide periods ... -
Lagrangian relaxation-based lower bound for the two-machine flow shop with synchronized periodic maintenance
Krimi, Issam; Benmaur, Rachid; Elhachemi, Nizar; Duvivier, David (IEEE, 2018-04)In this work, we present a Lagrangian relaxation approach to generate a new lower bound for the two-machine flow shop scheduling problem under synchronized and periodic maintenance activities. The word synchronized is used ... -
Model-Based operational analysis for complex systems: A case study for an integrated control system in a mining industry
Lafquih, H; Deshayes, Laurent; Lissane, Elhaq S; Krimi, Issam (2018)As many manufacturing processes, the mining industry falls within the traditional organization setup, in which the operations are executed in different locations but managed from one master place. This centralized ... -
Modeling and analysis of a quality traceability framework for phosphate extraction process: evidence from Morocco
Lafquih, Hind; Elhaq, Saad Lissane; Krimi, Issam; Berquedich, Mouna (Emerald Publishing Limited, 2021-10)Purpose According to United Nations reports, the worldwide population is expected to reach around 9.6 billion by 2050. This forecasting emphasizes the role of phosphate-based fertilizers for developing sustainable agriculture ... -
Modelling and solving the multi-quays berth allocation and crane assignment problem with availability constraints
Krimi, Issam; Todosijević, Raca; Benmansour, Rachid; Ratli, Mustapha; ETAL. (Springer, 2020-03)In this work, we are interested in the multi-quays berth allocation and crane assignment problem under availability restrictions. Availability restrictions may arise due weather conditions, or when, for example, cranes ... -
A no-delay single machine scheduling problem to minimize total weighted early and late work
Krimi, Issam; Benmansour, Rachid; Todosijević, Raca; Mladenovic, Nenad; Ratli, Mustapha (Springer, 2022)This paper investigates the no-delay single machine scheduling problem to minimize the total weighted early and late work. This criterion is one of the most important objectives in practice but has not been studied so far ... -
Two-machine flowshop with synchronized periodic maintenance
Krimi, Issam; Benmansour, Rachid; Hanafi, Said; Elhachemi, Nizar (EDP Sciences, 2018)In the literature, some works deal with the two-machine flow shop scheduling problem under availability constraints. Most of them consider those constraints only for one machine at a time and also with limited unavailability ... -
A Variable Neighborhood Descent Heuristic for the Multi-quay Berth Allocation and Crane Assignment Problem Under Availability Constraints
Krimi, Issam; Aloullal, Afaf; Benmansour, Rachid; Cadi, Abdessamad Ait el; Deshayes, Laurent; ETAL. (Springer, 2018-10)In this paper, we consider the integrated Berth Allocation and Crane Assignment problem, with availability constraints and high tides restrictions, in bulk port context. We were inspired by a real case study of a port owned ...